Is the wire laid correctly on the floor slab in the apartment?

On top of the slab laid an insulated wire APPV in the apartment. They cut a plastic corrugation and laid a wire in it. Is it done right?

Loading...

One comment

  • Admin

    Hello! Why did you cut it? It was necessary to stretch the probe through the corrugation. Well now it means you need to fix the incision with tape or screeds along the entire length.

    To answer

Add a comment