Loading...

One comment

  • Admin

    Hello! It is possible to connect the electric meter after the voltage relay, however in this case it will be necessary to seal the contacts of the voltage relay. Or, as an option, install the so-called box for sealing modular equipment (in your case, it will be needed to seal the relay).

    To answer

Add a comment